| | On 4th April at 11:27 o’clock, the first airplane rolled over the freshly redeveloped bypass 07. The laying of the special terrain was planned in detail and implemented precisely. The two new bypasses, suitable for use all year round, provide a greater degree of safety at the airport and have significantly improved traffic controls. From now on, two airplanes will once again be able to prepare for takeoff at the same time and can take the run-up side by side. The bypasses can also serve as additional slide exit areas in an emergency situation. |